Langstead – Episode 17: Outer Oval Completion

A quick update to detail the completion of the Outer Oval Extension from last episode.

IMG_2269

The new line is now fully operational. As you’ll notice in the above photo, not all the landscaping has been finished. This is first to allow for the level crossing to be extended (how this will work I’m not sure yet due to the height difference). Secondly, I’ve not decided how to model over the join in the two boards. Previously I’ve laid ballast first leaving the track to be placed on top. (This picture illustrates that).  This works but makes the track uneven in places so I may investigate other methods – perhaps painting and adding railings to create a faux bridge. Continue reading

Langstead – Episode 15: Test Runs

Following on from Episode 14 I now have all the required extra bits of track to complete the new outer oval.

IMG_2193

Here’s a rather suspect panorama (thanks to iOS7) of The Mainline with the additional oval.

It’s hard to spot in the picture above but at the rear of the layout the oval runs on the old boards and at the front it drops down and runs on the new woodwork. This means either side must accommodate a modest gradient to raise and the lower the line between the sections. Continue reading