Langstead – Episode 17: Outer Oval Completion

A quick update to detail the completion of the Outer Oval Extension from last episode.

IMG_2269

The new line is now fully operational. As you’ll notice in the above photo, not all the landscaping has been finished. This is first to allow for the level crossing to be extended (how this will work I’m not sure yet due to the height difference). Secondly, I’ve not decided how to model over the join in the two boards. Previously I’ve laid ballast first leaving the track to be placed on top. (This picture illustrates that).  This works but makes the track uneven in places so I may investigate other methods – perhaps painting and adding railings to create a faux bridge. Continue reading

Langstead – Episode 16: Landscaping & Extension Update

In the last Episode I was testing the new outer oval and experimenting with building gradients out of cork floor tiles.

IMG_2232

As this was a success it’s time to start modelling the base board. As this is going to be a fairly big job, and to give myself more space whilst I do it, I’ve dismantled both the layout to work on one half at a time. Continue reading