CAS Weekly 20/02/15

Image by Phil Sangwell

Modelling

  • IC82 is back this Sunday with a new YouTube series.

UK Rail

  • GBRf are enlisted by Serco to haul the Caledonian sleeper for the next 15 years. They’ll be using a mixture of Class 90’s, 47’s and refurbished 73’s during their stint.
  • The East Anglia franchise, currently operated by Abellio, is out for tender.
  • A recent survey highlights the continuing decline of rail customer satisfaction…
  • …And surprise surprise, the rise of Social Media as a tool for passengers to voice this dissatisfaction.
  • But what we really want to know is, which train operator has the best ticket punches?
  • And which train operator went all gooey for Valentines Day?
  • …in a time where critics are calling for the return of nationalisations, the BBC’s Timeshift will take a look at the golden age of BR next Thursday.
  • Speaking of which, The Beauty of Transport is doing a series on British Rail’s corporate identity.
  • London Underground’s D-Stock trains could find a new life for themselves in Manchester.
  • Whilst back home The Victoria Line will be part closed for a month.
  • Danny Dyer has a go at tube announcements. Warning: It’s dreadful.
  • The London Transport Museum will host Londonist’s Matt Brown, who will be talking about Tube Secrets at the Hidden London Treasures Exhibition in April.
  • This article surfaced on Twitter this week, showcasing this rather quirky Brighton curiosity: The first every Electric Railway in Britain.

World Rail

Lions And Wheels (British Railways’ Lion Emblems, 1949-1964)

The Beauty of Transport is doing a series on British Rail’s corporate identity.

dwtransportwriting's avatarThe Beauty of Transport

On 1st January 1948, British Railways was born. It would go on to be one of the most infamous of British institutions, loved by some and reviled by many. Its corporate identity and “double arrow” logo would go on to attain international fame. But all that was to come later. The story of the early corporate identities of British Railways is one of occasional (if misplaced) design brilliance, but mostly complete confusion.

Funnily enough, there was never any need for this. British Railways was formed from the private railway companies which had operated the country’s rail network until 1948. It was nationalised alongside various bus companies, ports, canals, and road haulage firms as part of the grandly titled British Transport Commission (BTC). The other major transport undertaking which had been subsumed into the BTC was the already publicly-owned London Passenger Transport Board (LPTB) which had overseen London Transport since 1933…

View original post 2,792 more words

CAS Weekly 13/02/15

Image from Northern Rail

UK Rail

  • Spanish firm CAF win bid to build new sleeper cars for the new Caledonian sets.
  • Manchester Airport has a new platform.
  • Whilst Birmingham Snow Hill is mooted for a rebuild.
  • London Reconnections take you through the Crossrail Launch Plan.
  • Commute London revamp their website. Find out how the capital’s rail franchises are fairing on social media.
  • Abandoned tube tunnels could be turned into cycle lanes
  • …but I tell you why this is dreadful idea.
  • Virgin will replace the East Coast Loyalty Reward system with Nectar when they take over the franchise. Regular customers are upset.
  • A sneak peak of the Class 319’s being kitted out in Northern Rail livery.
  • Diamond Geezer rides a ghost train to West Ruislip.
  • …and Arsenal fans are concerned about their slip down the table after a visit to the Transport Museum.

World Rail

Feature Image by David Chandler.

CycleLine: Another Mad Idea

Yesterday, The Guardian published this article about the Gensler led design to turn London’s abandoned tube tunnels into underground cycle lanes.

https://twitter.com/AndyPCarter/status/563511506394812417

As you can see, this didn’t really strike a chord with me. So as a response – here’s why:

Proposed Route Image from Gensler

Closed

As I discovered when I visited Aldwych Station a year ago, The former Piccadilly line between Holborn and The Strand originally closed as it was deemed uneconomically viable to refurbish the lifts (to the tune of £3m in 1994 money) to cater for the low patronage of 450 passengers per day. Presumably this stance would have to be reversed if the Cycle UnderLine were to provide access to the street at Aldwych, with additional lifts being required at Holborn. Even though I’m sure it would be hoped that more than 450 people per day use the stretch as a cycle lane, this still doesn’t warrant such a big expenditure just to remove cyclists from 0.3 miles of Kingway (the road above). As the whole point of cycling in London is to beat the traffic, and considering that you can walk from Holborn to Aldwych in 6 minutes, I’m not convinced this would save anyone any time. If anything it would make your journey longer.

This video really annoys me – Firstly because an example taxi journey of Green Park – Aldwych is somehow being compared with a cycle journey between the Isle of Dogs – Greenwich. The later of which is 1.2 miles shorter. Secondly – YOU’RE NOT SUPPOSED TO CYCLE IN THE GREENWICH FOOT TUNNEL!

The stretch of tunnel from Green Park to somewhere underneath Strand, East of Charing Cross, was part of The Jubilee Line up until 1999 when the line was extended towards Stratford. Again, it was considered a waste of money to keep this short branch open when Charing Cross was already being adequately served by the Bakerloo Line in a similar direction. Again I’m not sure that a cycle-bypass is really needed here, as you could easily use The Mall and Green Park to safely avoid the bulk of the area’s traffic. Further more, I’m not convinced using the entire proposed tunnel as a continuous route (Holborn – Green Park) would be an effective use of time. If you’re a serious cyclist, you’d just stay at street level on Shaftesbury Ave, and if you’re a novice – well you’d just take the Piccadilly Line and be there quicker.

Capacity & Cost

OK, so this design is at least trying to think of ways to reuse our redundant underground spaces practically, it just isn’t a very well thought out idea. There’s nothing wrong with the concept of underground cycle lanes, in fact as blue-sky thoughts go it’s not half bad. The problem is it’s being applied to a mismatch of routes and tunnels that weren’t even very useful as railways. For this scheme to work you’d have to construct a completely new route, east-west or north-south (A Cycle Crossrail if you will) to really provide congestion relief and a safer, quicker passage for cyclists. With London’s subterranean space now at such a premium, to make any new tunnelling cost effective it really needs to be allocated to high-capacity railway – most likely to a National Rail standard. Look at the proposed Crossrail 2 route. This was originally to be a Tube line from Epping – Wimbledon, but to make the most of any proposed new tunnelling it will now be linked to Suburban National Rail Lines to maximise every last drop of capacity. With all the best will in the world a brand new cycle-only tunnel would not be used as much as a railway or tube line, let alone one that doesn’t connect anywhere useful like Gensler’s.

The question also has to be raised, how would the conversion to cycle lane, the additional lifts and tunnelling be paid for? And how are costs recouped once constructed? You can’t charge cyclists for it’s use. They’d just stay on the streets above if you did. You’d have to look at some kind of commercial sponsorship or combined commercial use as the video suggests. Are shops with cycle-only footfall viable? I don’t know. Maybe in a utopian society, but in London probably not. So then you’d have to open access to pedestrians… and the whole scheme is closer and closer to circling the drain.

Recycling

The idea of recycling space is still nonetheless a good one, so how can we use these redundant spaces more practically? Excellent question.

Seeing as both sets of tunnels are still electrified and maintained by London Underground it seems fairly sensible to keep them as railways and try to improve their fortunes. From the early 20th century it was suggested that the Aldwych branch should be extended southwards to Waterloo and beyond. I’ve suggested this myself before as it would alleviate congestion on the Northern Line, and provide a new north-south tube tunnel – of which there aren’t enough.

Image by London Reconnections

As for the Charing Cross tunnels, these have long been mooted as a potential DLR extension from Bank to free up capacity on the Central Line (known as the Horizon study).

Both lovely ideas, but again not without their downfalls: To extend the Piccadilly Line southwards would require an expensive rebuild of Holborn. As London Reconnections point out extending the DLR west would create all sorts of capacity problems at Bank not to mention overuse on the rest of the Dockland’s Network as well. Nevertheless, although more expensive, both ideas above would provide far more lasting capacity per £ over Gensler’s UnderLine.

New York Transit Museum Station. Image by Marcin Wichary

I however think there’s a better way to recycle the tunnels. Make them part of the London Transport Museum. This was recently done at New York’s equivalent where the platform levels are able to showcase rolling stock and past station architecture. You could use the remaining tunnels for exhibits, cafe/retail spaces or even heritage runs of old stock!

CAS Weekly 02/02/15

London Upside Down! Or is it?

Modelling

  • Windcutter takes a look at one of Hornby’s new wagon releases. Find out if it’s any good.
  • Hornby also release some snaps of it’s upcoming Class 92 release.

UK Rail

Featured image “Whistle” on K&ESR by Oast House Archive.